Process & payments

You pay in stages — only for work that is finished

Each instalment has a list of work that must be done, with photos and video before you pay — always into the company account.

Six steps from land visit to handover

  1. 011 – 2 weeks

    Brief + land visit

    We visit the land: levels, access, water and power, legal setbacks.

  2. 022 – 3 weeks

    Adjust plan + quote

    We adapt the rooms and give an itemised quote. Nothing to pay until you sign.

  3. 0330 – 45 days

    Contract + permit

    The contract lists stages, start and finish dates, late penalties and warranty. We file the permit.

  4. 045 – 12 months

    Construction

    An engineer checks every stage; weekly photos and video on LINE; visit the site any time.

  5. 052 weeks

    Inspection + handover

    We walk the house together, list every snag and fix it before the final payment.

  6. 06Warranty period

    Aftercare

    Report issues on LINE; a technician visits within the agreed time; free one-year check.

Payments tied to finished work

A sample eight-stage schedule. Each payment is made only after that work is checked.

Payments tied to finished work
StageWork finished before paymentShare
1Contract signed + permit filed5%
2Piles, footings, ground beams15%
3Columns, beams, floor slabs15%
4Roof structure and covering15%
5Walls, plaster, door and window frames15%
6Electrical, plumbing, ceilings, flooring15%
7Doors, windows, sanitaryware, paint10%
8Inspection, snags fixed, handover10%

Estimate the price and instalments

Enter the usable area and spec level to see a price range and what each progress payment would be.

Storeys
Spec level

Laminate bedrooms, flush ceilings throughout, roof insulation, extra sockets

Estimated build price

฿2.9 – 3.4 m

Estimate, not a quote

Estimated instalments

  1. 1Contract signed + permit filed · 5%143,000–168,000
  2. 2Piles, footings, ground beams · 15%428,000–504,000
  3. 3Columns, beams, floor slabs · 15%428,000–504,000
  4. 4Roof structure and covering · 15%428,000–504,000
  5. 5Walls, plaster, door and window frames · 15%428,000–504,000
  6. 6Electrical, plumbing, ceilings, flooring · 15%428,000–504,000
  7. 7Doors, windows, sanitaryware, paint · 10%286,000–336,000
  8. 8Inspection, snags fixed, handover · 10%286,000–336,000

Estimate from sample rates. Excludes land filling, fences, external works, loose furniture and permit fees. Your real price comes in a written quote after we see the land and plan.

Warranty

Written into the contract; report issues on LINE.

  • Structure (piles, footings, columns, beams, slabs)10 years
  • Roof leaks2 years
  • Electrical and plumbing1 year
  • Finishes and fittings1 year

Warranty periods are samples. Use your company's real terms — never less than Thai law requires (Civil and Commercial Code section 600 sets 5 years for buildings).

Seven checks before hiring any home builder — including us

Summarised from the Home Builder Association's advice (Oct 2026)

  • 1Check the company is a registered legal entity, and its history
  • 2Ask about trade-association membership and check the number
  • 3Read the contract: fair terms, stages, finish date, warranty
  • 4Instalments tied to finished work — no large upfront payments
  • 5Pay only the company account, never a personal one
  • 6Visit finished homes or talk to past owners
  • 7Keep the contract, quotes, receipts and progress photos

Check your land first

Have these ready before the land visit — your quote will be more accurate.

  • Title deed (chanote / Nor Sor 3 Gor) in the applicant's name
  • Boundary markers present and clear
  • Land level against the road (does it need filling?)
  • Access for concrete trucks and a crane
  • Power and mains water near the plot
  • Zoning and local building limits
  • Legal setbacks from boundaries and the road
  • Flood history of the area

Check us

Details you can actually check

Our company details are here for you to check before you decide — and every payment goes to the company account.

  • Written contract with stages, finish date and warranty
  • Pay for finished work — no large upfront payment
  • Progress photos and video every week
  • Staff may never take payment into a personal account
Company
Baan Saeng Homes Co., Ltd.
Company registration no. [0-0000-00000-00-0]
Verify
Supervising engineer
Supervising engineer: [Full name], licence no. [00000]
Verify
Home Builder Association member: [your member no. — or delete this line]
Contractor's all-risk & third-party insurance: [insurer / policy no.]
The only account we take payments into
Sample Bank, Khon Kaen branch
Baan Saeng Homes Co., Ltd.
000-0-00000-0

Questions people ask

How much do I pay before work starts?

5% when you sign and we file the permit. After that you pay only for finished work. (Sample — edit in site.ts.)

Can I change a plan?

Yes. Move or enlarge rooms, add a prayer room or Thai kitchen — the price follows the area and materials.

What if the build runs late?

The contract sets a finish date and a daily penalty, except for force majeure or extra work agreed in writing.

Can I use a construction loan?

Yes. We prepare drawings, quotes and stages in the format banks use for drawdowns.

Do I need to be on site?

No. We send photos and video weekly and arrange a check before each payment. Visit whenever you like.